So here comes the making of the fence.
Starting things off by build the two basic frames. The top one and the bottom one:
Then on each frame, drill .65mm (.025") big hole for the rod:
Then insert few rods for test fit:
Fill up all holes with diameter of .64mm styrene rods:
And finally, finish up the rest:
HOWEVER, I totally miscalculated the height of the heating system. The heating system ended up some what too tall IMO. Might going back and fix it (by cutting one side off and replace it...) later on if the scale is off horribly.
I call this some what epic fail. This is a lesson learned for me, still a long way for me to go.
Next, off to the pipe and the power supply.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment